At this Primary School these two classrooms were mis-shapen with restricted space where a semi-circular area had been taken to create smaller teaching spaces. These areas were removed to create larger, brighter classrooms.
Works the FSH Team carried out
- An initial asbestos survey.
- Removal of existing partitions.
- Installation of new partition walls and new fire doors.
- New vinyl flooring and carpet throughout.
- Installation of new timber panelling to match existing.
- Electrical alterations including new LED lighting and new sockets.
- A new suspended ceiling.
- Creation of a new wet area, which included sinks with housing units, plumbing and tiling.